The owner builder gods have been smiling upon me…… since expressing concern about maybe having missed the boat with further concreting and Tasmania’s fickle weather, the frosty and rainy weather went on holidays long enough that I decided to persevere, and it’s all paid off….

20170606_103258

shower grates

Mind you, it wasn’t without the odd thing going wrong. As Glenda and I reinvented the bathroom layouts, I had to wait for several days for the new grates we are going to use in the shower area before I was able to finish the second spider (see above link). I ended up buying two of these online for $200, while Bunnings were selling them for $300 each…… always shop around!

While waiting, I made three of the four pipes that run into the riser. The riser was in its position, in the middle of the bathroom mockup in the shed, ready to go; once the fourth pipe was carefully glued together, I assembled the spider, only to discover later that the riser had been sitting for days on the floor upside down……… Sacré bleu! I thought I’d worked a way to get away with it, even dragging it up to the house site for installation, until I realised that the riser is moulded in such a way that all those pipes fall to the fitting (it’s only a two degree fall, but it’s important!) and that now all those pipes were going uphill…… and as we all know, water does not run uphill!

I really hate stuffing things up, but I had to go and buy another fitting (50km return trip and $35 later..), destroy the original one, and refit the entire thing properly. I’m getting really good at problem solving.

20170613_101112

waterproof membrane in place

I re-hired Caleb to do my heavy lifting and unload another couple of tons of crusher dust off the ute to cover up all those bare dirt patches between the trenches while I went to work putting them together.

There’s a lot to think about. I almost forgot to glue the outlet pipe from the second bathroom, and had to dig it up, by hand. No major drama this time, but there you go. These outlets also have to be lagged with 40mm of foam where they penetrate the footing in case the highly reactive soil I seem to continually build on make the concrete move and break the pipes. It pays to know how

20170613_112350

lagged outlet pipe

to read an engineer’s drawings!

Once all the crusher dust was in place, we covered it with the thick plastic moisture proof membrane my supplier sold me, and before you know it, I was ordering another ten cubic metres of concrete.

On the day, I was training Caleb on how I wanted him to rake the concrete towards himself while he stood on the first footing and I inserted the concrete vibrator into the pile of the wet stuff that would land in the middle of the trench. To my amazement, and Caleb’s visible delight, as soon as the vibrator started doing its thing, the concrete came to the end of the trench all by itself, like water in a flash flood……  I tell you, that device is worth its weight in gold! It easily does the work of at least one other man, and maybe more. Mind you, I also had to deal with the end of the machine vibrating itself off, and having to work out the thread was mysteriously left hand – very odd, as left hand threads are usually used to stop things vibrating off! No pressure….  I only had a concrete truck waiting for me to get going again…….

We had two truck loads of concrete in place within just forty-five minutes……. and I had expected it to take twice this long with only two of us on the job!

Now all I have to do is pour a perfectly level and perfectly flat slab on top of the whole thing (after I return from another trip to Queensland to celebrate our fortieth wedding anniversary!), and we can start BUILDING! I really can’t wait to be past this stage; I didn’t want to do this in the first place, but I am saving so much money, it will all be worth it. And to be honest, it’s all turned out even better than I expected, and I am justifiably proud of my handy work……  watch this space.